January 25

One New Zealand Stadium – Te Kaha

Client: Christchurch City Council

Main Contractor: Besix Watpac

Design Engineer: Mott MacDonald | Powell Fenwick

Mechanical Contractor: Ellis Air Conditioning Pty Ltd

Year Built: 2026

AirRated® Ltd was appointed to commission the stadium’s HVAC airside systems on one of New Zealand’s premier public infrastructure projects, One New Zealand Stadium - Te Kaha. Our scope covered the full commissioning and verification of air handling and distribution systems, including critical stairwell pressurisation systems designed to protect occupants and support safe fire egress. Through a rigorous commissioning process, AirRated® ensured all systems performed in line with design intent, life-safety requirements, and handover expectations.


Tags

2025, 2026, Commissioning, HVAC commissioning, Projects