Client: Christchurch City Council
Main Contractor: Besix Watpac
Design Engineer: Mott MacDonald | Powell Fenwick
Mechanical Contractor: Ellis Air Conditioning Pty Ltd
Year Built: 2026
AirRated® Ltd was appointed to commission the stadium’s HVAC airside systems on one of New Zealand’s premier public infrastructure projects, One New Zealand Stadium - Te Kaha. Our scope covered the full commissioning and verification of air handling and distribution systems, including critical stairwell pressurisation systems designed to protect occupants and support safe fire egress. Through a rigorous commissioning process, AirRated® ensured all systems performed in line with design intent, life-safety requirements, and handover expectations.