<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>2022 Projects Archives | AirRated NZ</title>
	<atom:link href="https://airrated.co.nz/category/projects/2022-projects/feed/" rel="self" type="application/rss+xml" />
	<link>https://airrated.co.nz/category/projects/2022-projects/</link>
	<description>HVAC Commissioning Services</description>
	<lastBuildDate>Sat, 24 Jan 2026 00:39:17 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.1</generator>

<image>
	<url>https://ml1ifbknuway.i.optimole.com/cb:oZo-.65341/w:512/h:512/q:mauto/g:sm/f:best/ig:avif/https://airrated.co.nz/wp-content/uploads/2022/03/cropped-favicon-5.png</url>
	<title>2022 Projects Archives | AirRated NZ</title>
	<link>https://airrated.co.nz/category/projects/2022-projects/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Invercargill Central</title>
		<link>https://airrated.co.nz/invercargill-central/</link>
					<comments>https://airrated.co.nz/invercargill-central/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sat, 24 Jan 2026 00:00:28 +0000</pubDate>
				<category><![CDATA[2022 Projects]]></category>
		<category><![CDATA[2023 Projects]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[2022]]></category>
		<category><![CDATA[2023]]></category>
		<category><![CDATA[Commissioning]]></category>
		<category><![CDATA[HVAC commissioning]]></category>
		<guid isPermaLink="false">https://airrated.co.nz/?p=3656</guid>

					<description><![CDATA[<p>Client:&#160;Invercargill Central Ltd&#160;Main Contractor:&#160;Amalgamated Building LtdDesign Engineer:&#160;Cosgroves LtdMechanical Contractor:&#160;Beattie AirYear Built:&#160;2022/2023In Invercargill’s inner-city block, a brand-new central city mall has been successfully built by the primary contractor, Amalgamated Building Limited (ABL). The project underwent a phased handover process until its successful completion. Beattie Air was responsible for installing the mechanical ventilation systems according to Cosgroves’ [&#8230;]</p>
<p>The post <a href="https://airrated.co.nz/invercargill-central/">Invercargill Central</a> appeared first on <a href="https://airrated.co.nz">AirRated  NZ</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="thrv_wrapper thrv_text_element">	<h5 class=""><br>Client:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-18b549a9cf3">Invercargill Central Ltd&nbsp;</span></span></h5><h5 class="">Main Contractor:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-18b549a9cf6">Amalgamated Building Ltd</span></span></h5><h5 class="">Design Engineer:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-18b549a9cf9">Cosgroves Ltd</span></span></h5><h5 class="">Mechanical Contractor:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-18b549a9cfb">Beattie Air</span></span></h5><h5 class="">Year Built:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-18b549a9cfd">2022/2023</span></span></h5><p data-css="tve-u-18b549a9cd3">In Invercargill’s inner-city block, a brand-new central city mall has been successfully built by the primary contractor, Amalgamated Building Limited (ABL). The project underwent a phased handover process until its successful completion. Beattie Air was responsible for installing the mechanical ventilation systems according to Cosgroves’ design specifications. AirRated® served as the <a href="https://airrated.co.nz/independent-commissioning-agents/" target="_blank">commissioning agents</a>, overseeing the administration and retail areas within the new center</p></div><div class="tcb_flag" style="display: none"></div>
<span class="tve-leads-two-step-trigger tl-2step-trigger-0"></span><span class="tve-leads-two-step-trigger tl-2step-trigger-0"></span><p>The post <a href="https://airrated.co.nz/invercargill-central/">Invercargill Central</a> appeared first on <a href="https://airrated.co.nz">AirRated  NZ</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://airrated.co.nz/invercargill-central/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Mount Aspiring College</title>
		<link>https://airrated.co.nz/mount-aspiring-college/</link>
					<comments>https://airrated.co.nz/mount-aspiring-college/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sat, 24 Jan 2026 00:00:21 +0000</pubDate>
				<category><![CDATA[2022 Projects]]></category>
		<category><![CDATA[2023 Projects]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[2022]]></category>
		<category><![CDATA[2023]]></category>
		<category><![CDATA[Commissioning]]></category>
		<category><![CDATA[HVAC commissioning]]></category>
		<guid isPermaLink="false">https://airrated.co.nz/?p=3646</guid>

					<description><![CDATA[<p>This project comprised three distinct stages, with the primary redevelopment effort referred to as the South Block, encompassing both Stage 1 and Stage 2.</p>
<p>The post <a href="https://airrated.co.nz/mount-aspiring-college/">Mount Aspiring College</a> appeared first on <a href="https://airrated.co.nz">AirRated  NZ</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="thrv_wrapper thrv_text_element">	<h5 data-css="tve-u-184278afad7" class=""><span data-css="tve-u-184278afad8"><strong>Client:&nbsp;</strong><span style="font-weight: normal;">Ministry of Education</span></span></h5><h5 data-css="tve-u-184278afad9" class=""><span data-css="tve-u-184278afada"><strong>Main Contractor:</strong><span style="font-weight: normal;"> Naylor Love Central Otago Ltd</span></span></h5><h5 data-css="tve-u-184278afadb" class=""><span data-css="tve-u-184278afadc"><strong>Design Engineer:&nbsp;</strong><span style="font-weight: normal;">BECA Ltd</span></span></h5><h5 data-css="tve-u-184278afadd" class=""><strong><span data-css="tve-u-184278afade">Mechanical Contractor:</span></strong><span data-css="tve-u-184278afadf">&nbsp;<span style="font-weight: normal;">Aquaheat NZ Ltd</span></span></h5><h5 data-css="tve-u-184278afae0" class=""><strong><span data-css="tve-u-184278afae1"><strong>Year Built:</strong>&nbsp;</span></strong><span style="font-weight: normal;"><span data-css="tve-u-184278afae2">2022/2023</span></span></h5><p><span data-css="tve-u-18b54a44df7">This project comprised three distinct stages, with the primary redevelopment effort referred to as the South Block, encompassing both Stage 1 and Stage 2.</span></p><p><span data-css="tve-u-18b54a44df9">The South Block now stands as a two-story structure, housing multiple new classrooms, breakout spaces, library facilities, and staff workrooms/offices. Stage 3 saw the construction of the Administration Block, situated north of Stages 1 and 2.</span></p><p><span data-css="tve-u-18b54a44dfa">Aquaheat NZ Ltd successfully installed new HVAC systems in these buildings, seamlessly integrating them with existing mechanical and electrical services. AirRated® provided </span><a href="https://airrated.co.nz/what-is-hvac-commissioning/" target="_blank"><span data-css="tve-u-18b54a44dfa">commissioning services</span></a><span data-css="tve-u-18b54a44dfa"> for the mechanical air and water systems in these completed structures.</span></p></div><div class="tcb_flag" style="display: none"></div>
<span class="tve-leads-two-step-trigger tl-2step-trigger-0"></span><span class="tve-leads-two-step-trigger tl-2step-trigger-0"></span><p>The post <a href="https://airrated.co.nz/mount-aspiring-college/">Mount Aspiring College</a> appeared first on <a href="https://airrated.co.nz">AirRated  NZ</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://airrated.co.nz/mount-aspiring-college/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Ayrburn Stone Domain Buildings</title>
		<link>https://airrated.co.nz/ayrburn-stone-domain-buildings/</link>
					<comments>https://airrated.co.nz/ayrburn-stone-domain-buildings/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sat, 24 Jan 2026 00:00:08 +0000</pubDate>
				<category><![CDATA[2022 Projects]]></category>
		<category><![CDATA[2023 Projects]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[2022]]></category>
		<category><![CDATA[2023]]></category>
		<category><![CDATA[Commissioning]]></category>
		<category><![CDATA[HVAC commissioning]]></category>
		<guid isPermaLink="false">https://airrated.co.nz/?p=3625</guid>

					<description><![CDATA[<p>AirRated® have been engaged to independently commission the air and water systems in this new facility.</p>
<p>The post <a href="https://airrated.co.nz/ayrburn-stone-domain-buildings/">Ayrburn Stone Domain Buildings</a> appeared first on <a href="https://airrated.co.nz">AirRated  NZ</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="thrv_wrapper thrv_text_element">	<h5 class=""><br>Client:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-184278afa99">Winton</span></span></h5><h5 class="">Main Contractor:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-184278afa9a">Cook Brothers Construction Ltd</span></span></h5><h5 class="">Design Engineer:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-184278afa9b">Aquaheat NZ Ltd</span></span></h5><h5 class="">Mechanical Contractor:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-184278afa9c">Aquaheat NZ Ltd</span></span></h5><h5 class="">Year Built:<span data-css="tve-u-184278afa9d">&nbsp;<span style="font-weight: normal;">2022/2023</span></span></h5><p data-css="tve-u-184278afa9e"><span data-css="tve-u-184ca48e8ba">Ayrburn Stone Domain Buildings is a heritage development based around three repurposed historic stone buildings. The mechanical package is a design build by Aquaheat NZ. AirRated</span><span data-css="tve-u-184278afa9f"><span data-css="tve-u-184ca48e8bc">®</span></span><span data-css="tve-u-184ca48e8bd">&nbsp;have been appointed to </span><a href="https://airrated.co.nz/what-is-hvac-commissioning/" target="_blank"><span data-css="tve-u-184ca48e8bd">commission </span></a><span data-css="tve-u-184ca48e8bd">the air conditioning and ventilation systems.</span></p></div><div class="thrv_wrapper tve_wp_shortcode"><div class="tve_shortcode_raw" style="display: none"></div><div class="tve_shortcode_rendered"><p></p>
<h3 class="wp-block-heading"></h3>
<p></p>
</div></div><div class="tcb_flag" style="display: none"></div>
<span class="tve-leads-two-step-trigger tl-2step-trigger-0"></span><span class="tve-leads-two-step-trigger tl-2step-trigger-0"></span><p>The post <a href="https://airrated.co.nz/ayrburn-stone-domain-buildings/">Ayrburn Stone Domain Buildings</a> appeared first on <a href="https://airrated.co.nz">AirRated  NZ</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://airrated.co.nz/ayrburn-stone-domain-buildings/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>YMCA Christchurch &#8211; Stage 2</title>
		<link>https://airrated.co.nz/ymca-christchurch-stage-2/</link>
					<comments>https://airrated.co.nz/ymca-christchurch-stage-2/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sat, 24 Jan 2026 00:00:01 +0000</pubDate>
				<category><![CDATA[2022 Projects]]></category>
		<category><![CDATA[2023 Projects]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[2022]]></category>
		<category><![CDATA[2023]]></category>
		<category><![CDATA[Commissioning]]></category>
		<category><![CDATA[HVAC commissioning]]></category>
		<guid isPermaLink="false">https://airrated.co.nz/?p=3618</guid>

					<description><![CDATA[<p>Client:&#160;YMCA Main Contractor:&#160;Cook Brothers Construction Ltd Design Engineer:&#160;Mesh Consulting Ltd Mechanical Contractor:&#160;VAE Group&#160; Year Built:&#160;2022/2023 Stage 2 involves the establishment of a dedicated facility for the YMCA’s community-oriented initiatives. This space will house a versatile black-box theatre, a preschool, areas for health and well-being programs, educational resources for young individuals, dance and movement studios, as [&#8230;]</p>
<p>The post <a href="https://airrated.co.nz/ymca-christchurch-stage-2/">YMCA Christchurch &#8211; Stage 2</a> appeared first on <a href="https://airrated.co.nz">AirRated  NZ</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="thrv_wrapper thrv_text_element">
<h5 class="">Client:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-18b54b131c0">YMCA</span></span></h5>
<h5 class="">Main Contractor:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-18b54b131c3">Cook Brothers Construction Ltd</span></span></h5>
<h5 class="">Design Engineer:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-18b54b131c5">Mesh Consulting Ltd</span></span></h5>
<h5 class="">Mechanical Contractor:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-184278afa9c">VAE Group&nbsp;</span></span></h5>
<h5 class="">Year Built:<span style="font-weight: normal;"><span data-css="tve-u-18b54b131c7">&nbsp;2022/2023</span></span></h5>
<p><span data-css="tve-u-18b54b131c9">Stage 2 involves the establishment of a dedicated facility for the YMCA’s community-oriented initiatives. This space will house a versatile black-box theatre, a preschool, areas for health and well-being programs, educational resources for young individuals, dance and movement studios, as well as various support services, such as a general medical practice and physiotherapy. These activities will take place within a fully operational environment.</span></p>
<p><span data-css="tve-u-18b54b131ca">The design concept aims to create a new focal point for the YMCA along Rolleston Avenue, directly opposite the Christchurch Botanic Gardens. This will be achieved by activating a central courtyard between Hotel Give and the new building, effectively forming a central hub within the broader YMCA redevelopment.</span></p>
<p><span data-css="tve-u-18b54b131cc">Ultimately, this building will serve as a cross-cultural and cross-generational community hub, bringing vibrancy to the heart of Ōtautahi Christchurch.</span></p>
<p><span data-css="tve-u-18b54b131cd">AirRated® have been engaged to </span><a href="https://airrated.co.nz/independent-commissioning-agents/" target="_blank"><span data-css="tve-u-18b54b131cd">independently commission</span></a><span data-css="tve-u-18b54b131cd"> the air and water systems in this new facility.</span></p>
</div>
<div class="tcb_flag" style="display: none"></div>
<span class="tve-leads-two-step-trigger tl-2step-trigger-0"></span><span class="tve-leads-two-step-trigger tl-2step-trigger-0"></span><p>The post <a href="https://airrated.co.nz/ymca-christchurch-stage-2/">YMCA Christchurch &#8211; Stage 2</a> appeared first on <a href="https://airrated.co.nz">AirRated  NZ</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://airrated.co.nz/ymca-christchurch-stage-2/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Wakatipu High School &#8211; Stage 3</title>
		<link>https://airrated.co.nz/wakatipu-high-school-stage-3/</link>
					<comments>https://airrated.co.nz/wakatipu-high-school-stage-3/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 23 Jan 2026 23:59:55 +0000</pubDate>
				<category><![CDATA[2021 Projects]]></category>
		<category><![CDATA[2022 Projects]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[2021]]></category>
		<category><![CDATA[2022]]></category>
		<category><![CDATA[Commissioning]]></category>
		<category><![CDATA[HVAC commissioning]]></category>
		<guid isPermaLink="false">https://airrated.co.nz/?p=3598</guid>

					<description><![CDATA[<p>This project involved the extension and modification of the existing Wakatipu High School located in Queenstown, New Zealand.</p>
<p>The post <a href="https://airrated.co.nz/wakatipu-high-school-stage-3/">Wakatipu High School &#8211; Stage 3</a> appeared first on <a href="https://airrated.co.nz">AirRated  NZ</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="thrv_wrapper thrv_text_element">
<h5 data-css="tve-u-635e058add8140" class=""><span data-css="tve-u-635e058add8157">Client:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-184ca47b792">Ministry of Education</span></span></span></h5>
<h5 data-css="tve-u-635e058add8171" class=""><span data-css="tve-u-635e058add8182"><strong><span data-css="tve-u-635e058add8193">Main Contractor:&nbsp;</span></strong><span style="font-weight: normal;"><span data-css="tve-u-184ca47b796"><span data-css="tve-u-635e058add81b9"><span data-css="tve-u-635e058add81c5">Southbase Construction Ltd</span></span></span></span></span></h5>
<h5 data-css="tve-u-635e058add81d7" class=""><span data-css="tve-u-635e058add81e8"><span data-css="tve-u-635e058add81f0"><span data-css="tve-u-635e058add8206"><strong>Design Engineer:&nbsp;</strong><span style="font-weight: normal;"><span data-css="tve-u-184ca47b798">Norman Disney &amp; Young Ltd</span></span></span></span></span></h5>
<h5 data-css="tve-u-635e058add8226" class=""><span data-css="tve-u-635e058add8233"><span data-css="tve-u-635e058add8242"><span data-css="tve-u-635e058add8252">Mechanical Contractor:&nbsp;<span style="font-weight: normal;"><span data-css="tve-u-184ca47b79a">Aquaheat NZ Ltd</span></span></span></span></span></h5>
<h5 data-css="tve-u-635e058add8271" class=""><span data-css="tve-u-635e058add8285"><span data-css="tve-u-635e058add82a2"><span data-css="tve-u-635e058add82b7">Year Built:<span style="font-weight: normal;">&nbsp;</span></span><span style="font-weight: normal;"><span data-css="tve-u-184ca47b79c">2021/2022</span></span></span></span></h5>
<p data-css="tve-u-635e058add8527">This project involved the extension and modification of the existing Wakatipu High School located in Queenstown, New Zealand. The existing school is known as Stage 1.</p>
<p data-css="tve-u-635e058add8548">These extension works are known as Stage 3. Stage 3 involves extension of the North and South teaching wings, internal alterations to various existing spaces and a new double gymnasium. AirRated<span data-css="tve-u-184ca47b7a0">®</span>&nbsp;has<span data-css="tve-u-635e058add8553">&nbsp;</span><a href="https://airrated.co.nz/what-is-hvac-commissioning/" target="_blank">commissioned</a> the mechanical air and water systems for these areas.</p>
</div>
<div class="tcb_flag" style="display: none"></div>
<span class="tve-leads-two-step-trigger tl-2step-trigger-0"></span><span class="tve-leads-two-step-trigger tl-2step-trigger-0"></span><p>The post <a href="https://airrated.co.nz/wakatipu-high-school-stage-3/">Wakatipu High School &#8211; Stage 3</a> appeared first on <a href="https://airrated.co.nz">AirRated  NZ</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://airrated.co.nz/wakatipu-high-school-stage-3/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
