January 24

Invercargill Central


Client: Invercargill Central Ltd 
Main Contractor: Amalgamated Building Ltd
Design Engineer: Cosgroves Ltd
Mechanical Contractor: Beattie Air
Year Built: 2022/2023

In Invercargill’s inner-city block, a brand-new central city mall has been successfully built by the primary contractor, Amalgamated Building Limited (ABL). The project underwent a phased handover process until its successful completion. Beattie Air was responsible for installing the mechanical ventilation systems according to Cosgroves’ design specifications. AirRated® served as the commissioning agents, overseeing the administration and retail areas within the new center


Tags

2022, 2023, Commissioning, HVAC commissioning, Projects


You may also like

PAK’nSAVE Rolleston

Client: Foodstuffs South Island LtdMain Contractor: Naylor LoveDesign Engineer: Powell Fenwick LtdMechanical Contractor: Beattie AirYear Built: 2025AirRated® was engaged as the independent commissioning specialist for the new PAK’nSAVE Rolleston development, delivering performance verification of the HVAC and mechanical ventilation systems across the retail floor and associated admin spaces. Our scope included full airside testing and balancing, plant performance

Read More

The Court Theatre

AirRated® was engaged as the independent commissioning specialist for The Court Theatre, delivering performance verification of the HVAC and mechanical ventilation systems throughout this landmark performing arts facility.

Read More