January 24

Mount Aspiring College

Client: Ministry of Education
Main Contractor: Naylor Love Central Otago Ltd
Design Engineer: BECA Ltd
Mechanical Contractor: Aquaheat NZ Ltd
Year Built: 2022/2023

This project comprised three distinct stages, with the primary redevelopment effort referred to as the South Block, encompassing both Stage 1 and Stage 2.

The South Block now stands as a two-story structure, housing multiple new classrooms, breakout spaces, library facilities, and staff workrooms/offices. Stage 3 saw the construction of the Administration Block, situated north of Stages 1 and 2.

Aquaheat NZ Ltd successfully installed new HVAC systems in these buildings, seamlessly integrating them with existing mechanical and electrical services. AirRated® provided commissioning services for the mechanical air and water systems in these completed structures.


Tags

2022, 2023, Commissioning, HVAC commissioning, Projects


You may also like

PAK’nSAVE Rolleston

Client: Foodstuffs South Island LtdMain Contractor: Naylor LoveDesign Engineer: Powell Fenwick LtdMechanical Contractor: Beattie AirYear Built: 2025AirRated® was engaged as the independent commissioning specialist for the new PAK’nSAVE Rolleston development, delivering performance verification of the HVAC and mechanical ventilation systems across the retail floor and associated admin spaces. Our scope included full airside testing and balancing, plant performance

Read More

The Court Theatre

AirRated® was engaged as the independent commissioning specialist for The Court Theatre, delivering performance verification of the HVAC and mechanical ventilation systems throughout this landmark performing arts facility.

Read More