January 24

Tauhara Geothermal Power Station

0  comments

Client: Contact Energy
Main Contractor: Naylor Love Ltd
Design Engineer: VAE Group
Mechanical Contractor: VAE Group
Year Built: 2023

Contact Energy is currently overseeing the construction of the Tauhara Power Station in Taupō, located in the heart of New Zealand’s Central North Island.

This geothermal power station boasts a substantial capacity of 174MW and operates using a steam turbine system. It stands as Contact Energy’s sixth geothermal power facility in this region. Construction commenced early 2021 and Tauhara is on track to be fully operational by late 2023.

Positioned just off Broadlands Road to the east of Taupō, the Tauhara power station strategically taps into the rich geothermal energy resources of the area. Notably, VAE Group, renowned for their expertise in mechanical services, has masterminded and installed the mechanical systems within the new Turbine and Generator Building, Administration & Workshop Building, and Generator and Pump Room. AirRated® has been entrusted to independently commission the air and water systems related to HVAC services.


Tags

2023, Commissioning, HVAC commissioning, Projects


You may also like

PAK’nSAVE Rolleston

Client: Foodstuffs South Island LtdMain Contractor: Naylor LoveDesign Engineer: Powell Fenwick LtdMechanical Contractor: Beattie AirYear Built: 2025AirRated® was engaged as the independent commissioning specialist for the new PAK’nSAVE Rolleston development, delivering performance verification of the HVAC and mechanical ventilation systems across the retail floor and associated admin spaces. Our scope included full airside testing and balancing, plant performance

Read More

The Court Theatre

AirRated® was engaged as the independent commissioning specialist for The Court Theatre, delivering performance verification of the HVAC and mechanical ventilation systems throughout this landmark performing arts facility.

Read More