January 24

Te Huka Geothermal Power Station

Te Huka Geothermal Power Station 

Client: Contact Energy
Main Contractor: Naylor Love Ltd
Design Engineer: VAE Group
Mechanical Contractor: VAE Group
Year Built: 

The Te Huka Unit 3 power station, currently under construction on Centennial Drive in Taupō, New Zealand, is set to enhance the Te Huka geothermal power station site.

Geothermal energy is a remarkable yet often overlooked asset in New Zealand. Our nation proudly leads the world in this field, showcasing our technological prowess and innovative spirit. This sustainable resource offers an ideal solution for reducing our dependence on fossil fuel-based baseload generation within the national grid.

Notably, VAE Group, known for their mechanical expertise, has orchestrated and installed the mechanical systems in the new Turbine and Generator Building, Administration & Workshop Building, and Generator and Pump Room. AirRated® has been entrusted with the independent commissioning of the air systems related to HVAC services.


Tags

2023, 2024, Commissioning, HVAC commissioning, Projects


You may also like

PAK’nSAVE Rolleston

Client: Foodstuffs South Island LtdMain Contractor: Naylor LoveDesign Engineer: Powell Fenwick LtdMechanical Contractor: Beattie AirYear Built: 2025AirRated® was engaged as the independent commissioning specialist for the new PAK’nSAVE Rolleston development, delivering performance verification of the HVAC and mechanical ventilation systems across the retail floor and associated admin spaces. Our scope included full airside testing and balancing, plant performance

Read More

The Court Theatre

AirRated® was engaged as the independent commissioning specialist for The Court Theatre, delivering performance verification of the HVAC and mechanical ventilation systems throughout this landmark performing arts facility.

Read More