One New Zealand Stadium – Te Kaha

Client: Christchurch City Council

Main Contractor: Besix Watpac

Design Engineer: Mott MacDonald | Powell Fenwick

Mechanical Contractor: Ellis Air Conditioning Pty Ltd

Year Built: 2026

AirRated® Ltd was appointed to commission the stadium’s HVAC airside systems on one of New Zealand’s premier public infrastructure projects, One New Zealand Stadium - Te Kaha. Our scope covered the full commissioning and verification of air handling and distribution systems, including critical stairwell pressurisation systems designed to protect occupants and support safe fire egress. Through a rigorous commissioning process, AirRated® ensured all systems performed in line with design intent, life-safety requirements, and handover expectations.


Tags

2025, 2026, Commissioning, HVAC commissioning, Projects


You may also like

PAK’nSAVE Rolleston

Client: Foodstuffs South Island LtdMain Contractor: Naylor LoveDesign Engineer: Powell Fenwick LtdMechanical Contractor: Beattie AirYear Built: 2025AirRated® was engaged as the independent commissioning specialist for the new PAK’nSAVE Rolleston development, delivering performance verification of the HVAC and mechanical ventilation systems across the retail floor and associated admin spaces. Our scope included full airside testing and balancing, plant performance

Read More

The Court Theatre

AirRated® was engaged as the independent commissioning specialist for The Court Theatre, delivering performance verification of the HVAC and mechanical ventilation systems throughout this landmark performing arts facility.

Read More