January 24

Wakatipu High School – Stage 3

Client: Ministry of Education
Main Contractor: Southbase Construction Ltd
Design Engineer: Norman Disney & Young Ltd
Mechanical Contractor: Aquaheat NZ Ltd
Year Built: 2021/2022

This project involved the extension and modification of the existing Wakatipu High School located in Queenstown, New Zealand. The existing school is known as Stage 1.

These extension works are known as Stage 3. Stage 3 involves extension of the North and South teaching wings, internal alterations to various existing spaces and a new double gymnasium. AirRated® has commissioned the mechanical air and water systems for these areas.


Tags

2021, 2022, Commissioning, HVAC commissioning, Projects


You may also like

PAK’nSAVE Rolleston

Client: Foodstuffs South Island LtdMain Contractor: Naylor LoveDesign Engineer: Powell Fenwick LtdMechanical Contractor: Beattie AirYear Built: 2025AirRated® was engaged as the independent commissioning specialist for the new PAK’nSAVE Rolleston development, delivering performance verification of the HVAC and mechanical ventilation systems across the retail floor and associated admin spaces. Our scope included full airside testing and balancing, plant performance

Read More

The Court Theatre

AirRated® was engaged as the independent commissioning specialist for The Court Theatre, delivering performance verification of the HVAC and mechanical ventilation systems throughout this landmark performing arts facility.

Read More