Building compliance and testing, Building Warrant of Fitness, BWof, Compliance, Independent Qualified Persons, IQP
Exploring the Commissioning process HVAC Commissioning services are often thought as being carried out right at the end of a build sequence. In reality, commissioning is an integrated process that links in with the entire build process from offsite design through to post occupancy management and recommissioning. Pre-Construction Planning & Design Several activities take place
Read More
Building Warrant of Fitness (BWof)An independent Qualified Persons (IQP) completes inspection and maintenance on specified building systems as part of the BWoF compliance schedule. The Compliance Schedule states the content of specific systems within a building which require ongoing maintenance and annual checks by an Independent Qualified Person (IQP) to ensure those systems specified meet
Read More